All-inclusive contract template reference

Employer (abbreviated as Party A): __________________________________

Contractor (abbreviated as Party B):__________________________________

According to the "Contract Law of the People's Republic of China", "The Consumer Protection Law of the People's Republic of China", "Price Law of the People's Republic of China", "Regulations on the Supervision of Contract Forms of Beijing Municipality" and "Administrative Regulations of the Beijing Construction Market", the Ministry of Construction " The Trial Measures for Family Room Decoration Management and other related laws and regulations, combined with the specific circumstances of the project, Party A and Party B reached the following agreement based on equality, voluntariness and consensus, and complied.

The first project overview

1. Party A's decorated housing is legally resident. _____

Party B is an enterprise that has been approved by the municipal administration for industry and commerce and registered, and holds the "Certificate of Construction Industry Qualification" issued by the Municipal Construction Committee.

2. Decoration construction site: ________ District (County) _______________ Road ____ Lane (Village) ______________________ Building Room.

3. Housing structure: __________ room type ______ room _____ room _____ sets, construction area ___________ square meters.

4. Decoration construction content: (see Appendix I "Decoration Construction Contents").

5. Contracting methods: __________________ (including contract materials, contractors, and partial contracts).

6. Total price: ¥_________yuan, capitalized (RMB): ________________

among them:

Material fee: _____________________, labor cost: __________________

Management fee: ________________________________, design fee: _______

Garbage clearance freight: ____________________, tax (3.41%): ______

other fee:___________________________

The two parties agreed that if the construction content is changed or the materials are changed, the project money for this part shall be calculated separately.

7. Duration: Starting from _________ year_______ month________ day, to ________ year_______ month_______ day completed, duration ________ days.

The second material supply agreement:

1. Materials provided by Party A: (See Attachment II: "Party A Provides Materials and Equipment Table").

The materials and equipment that Party A is responsible for purchasing and supplying shall comply with the design requirements for qualified products, and shall be delivered to the site on time. Party A and Party B shall handle the handover procedures. If Party B finds that the materials and equipment provided by Party A have quality problems or differences in specifications, Party B shall promptly raise it to Party A. Party A shall still use it, which will result in the loss of the project. The responsibility shall be borne by Party A. Party A and Party B shall be responsible for the safekeeping of Party A's supply materials on time, and Party B shall be responsible for compensation for any losses caused by improper storage.

2. The decoration materials and equipment purchased and supplied by Party A shall be used for the residential decoration as stipulated in this contract. Party A shall not use it for other purposes without the consent of Party A. If Party B violates this provision, it shall compensate Party A twice the amount of the misappropriation materials and equipment price.

3. Materials provided by Party B: (See Annex III "Main Material Quote").

The materials and equipment supplied by Party B shall be accepted on site by Party A. If they do not meet the design, construction requirements or specifications, they shall be prohibited from use. If it has been used, Party B shall be responsible for the losses caused to the project.

The third article about the project quality and acceptance agreement:

1. This project implements DBJ08-62-97 "Technical Specification for Residential Building Decoration Engineering", DB31/T30-1999 "Residential Decoration Acceptance Standard" and other local standards formulated by the municipal construction administrative department, and quality assessment acceptance standards.

2. This project is designed by the _________ party and provides ______ copies of the construction drawings.

Construction Contract Decoration Residential Decoration Design Door Price Home Improvement

Dock Bumper

Dock Bumper,Rubber Dock Bumper,Marine Dock Bumper,Wall Bumper Guard

Road Separator Co., Ltd. , http://www.911signaleurope.de

Posted on