How much do you know about the workshop's dust-proof and wear-resistant floor construction process?

What is the workshop wear-resistant and dust-proof floor, I believe we are more familiar with it, it mainly refers to the formation of a wear-resistant and dust-proof floor through the concrete sealant curing agent, which is very suitable for workshops with high requirements on the ground. Here we will introduce in detail: workshop dust-proof and wear-resistant ground construction technology and precautions.

Workshop dust-proof and wear-resisting ground construction technology:

The first step: base treatment

The second step: rough grinding

Through a professional grinding machine, different grades of crude resin water-grinding tablets are used to sequentially grind the concrete floor in sequence, while water is used to clean or remove dirt mud on the ground with a large vacuum cleaner.

The third step: cutting

Talk about “BAGU Bagu” penetrating sealant curing agent soaked in the construction area, and keep the ground wet soaking time for about 1 hour. When the surface becomes viscous, wash the surface with clean water; naturally dry for 24 hours, according to the strength of different terrazzo floors. In the condition, the soaking material process can be repeated many times until the overall strength of the concrete floor meets the polishing requirements.

The fourth step: fine grinding

Through a professional grinding machine, the ground is sequentially and collectively grinded with different grades of fine resin water-grinding discs. At the same time, water is used for cleaning or large-scale vacuum cleaning is used to remove dirt slurry on the ground.

Step 5: Polishing

After a high-speed polishing operation on the ground with a polishing pad using a professional polishing machine, a marble-like surface can be formed.

Workshop dust and wear-resisting ground construction process precautions:

1. Monitor the concrete side to produce the template strictly according to the design elevation and ask the leveling instrument to check the elevation. Check if the template is firm and the height difference between two adjacent templates should be controlled within 1 mm.

2. The flatness after the completion of concrete pouring should comply with the national regulations, and the difference between 2M and the ruler should be <5MM.

3, sub-warehouse pouring concrete construction, after the completion of wear-resistant mold release, the edge of the concrete edge of the line cut, in order to ensure that the joint between the warehouse and warehouse straight.

4. Wear-resistant material should be scattered at least twice to ensure uniform material distribution and consistent color.

5. The more the wearable floor collects light, the more the ground is more dense, but it is necessary to control the wear-resistant surface layer to avoid blackening.

After the completion of the floor should have an effect:

1, the surface is smooth and delicate, there is a clear sense of light from a distance.

2, joints, corners and smooth.

3, try to avoid the appearance of trachoma, a large area appears very normal trachoma is normal. (Note: 7 days before concrete curing is very important. After the curing agent dries out, it should be sprinkled with water to keep the concrete wet. Conditions may cover the film.).

Editor's summary: The workshop dustproof and wear-resisting ground construction process and precautions are introduced here. I hope I can help you. For more information, please pay attention to this site.

What tiles wear resistant porch ground wear-resistant mat plant partition plant waterproof

Brick Pattern Steel Coil

Brick Pattern Steel Coil,Prepainted Aluzinc Steel Coils,Brick Color Coated Steel Sheet,Brick Metal Plate

Shandong Wofeng New Material Co., Ltd. , https://www.wofengcoil.com

Posted on