What are the decoration tenders? Documents required for decoration tendering

Many construction sites will hold a meeting on a pre-agreed place before getting the project. The industry is called the bidding meeting. The decoration bidding is held here as scheduled. The customer issues a tender notice to tell the project and other conditions that need to be renovated. Invite the designer to follow the steps in this place to conduct bidding. Next, let Xiaobian take everyone to look at the exciting content of the decoration tender .


装修招标


I. Decoration and tendering decoration project construction report construction


1. For decoration engineering construction projects within the scope of bidding for decoration projects and for which bidding procedures are required, the construction and registration procedures shall be submitted to the interior decoration association to obtain the construction number.


2. The construction contents of the decoration project mainly include: project name, construction site, investment scale, source of funds, project scale, structure form, delivery method, planned completion date and preparation, and preparation requirements.


3. Documents required for the construction of the newspaper:


a. Approval document for approval (approval of the superior or relevant department, resolution of the board of directors, report of the owner, etc.)


b. Relevant document data requirements (real estate certificate, fixed asset description, rental contract and design documents, etc.)


c. Approvals from relevant competent authorities (such as fire protection, sanitation and epidemic prevention, environmental protection, real estate departments, etc.).


d. Proof of funds


4. The newspaper construction registration is completed in the unified format of the “decoration project construction registration form”. After the qualification of the interior decoration industry association, the construction number is issued.


Second, the decoration of the tender for the construction of the unit of the qualification certification of the construction unit to handle the tender should have the following conditions


a. Legal person or other organization established by law


b. There are economic and technical management personnel who are suitable for the bidding project.


c. Ability to prepare bidding documents


d. Ability to review the qualifications of bidders


e. The ability to open bids, evaluate bids, and award bids. For construction units that do not have the above-mentioned conditions, they must entrust an intermediary agency with corresponding qualifications to act as the agent for bidding. The construction unit and the intermediary agency shall sign an agreement for the agency and bidding, and report to the interior decoration industry association for the record.


Third, the decoration bidding application bidding unit fills in the "indoor decoration project bidding application form" to the interior decoration industry association for review according to the actual situation, and can prepare the bidding documents upon approval.


4. The preparation of the bidding documents and the preparation of the bidding documents shall include the following contents:


1. Tender Notices and Schedules


装修招标



2. Contract conditions and terms of the contract agreement


3. Technical specifications


4. Drawings and other technical materials


5. Bidding price calculation basis


6. Quality level


7. Project progress


8. Proposal preparation time


9. Bid bond


10. Performance guarantee


11. The validity period of the bid


12. Material or equipment procurement and supply


13. Qualification review form


V. The preparation of the price of the project base price shall be carried out according to the calculation formula of the engineering quantity, according to the current calculation method of engineering cost in China, and bidding according to the engineering quantity list.


6. The tender notice shall be published on the relevant website of the Shanghai Interior Decoration Industry Association, and information may also be released through other media.


7. The bidding documents for the bidding documents shall be issued, and the drawings and relevant materials shall be distributed to the bidding units that meet the bidding requirements and meet the qualification requirements for bidding. After receiving the bidding documents, drawings and relevant materials, the bidding unit shall carefully check and confirm it.


8. On-site investigation and answering questions Generally, within 7 days after the issuance of the bidding documents, the bidding unit organizes the bidding unit to conduct on-site reconnaissance and suspect that the bidding unit should understand the project situation and the requirements of the construction unit as completely as possible.


IX. Preparation and submission of tender documents


1. The bidding unit prepares the bidding documents according to the bidding documents and on-site reconnaissance, Q&A and requirements.


2. Submit the bidding documents to the bidding unit according to the specified location before the deadline for submission of bids. After submitting the bidding documents, the bidding unit may modify or withdraw the submitted bidding documents before the deadline for bid submission.


10. After the bid opening and closing bidding, the bid opening meeting shall be held in the presence of the legal representative or authorized entrusting party of the bidding unit according to the specified time and place. The bid opening meeting shall be organized and presided over by the bidding unit.


XI. The bid evaluation shall be reviewed by the bid evaluation unit to organize the bid evaluation committee according to the bid documents submitted by each bidding unit.


12. The award is based on the evaluation rules of the evaluation, and the evaluation opinions and scores of the comprehensive evaluation experts. The winning bidder was selected.


XIII. The contract signing unit and the bidding unit will sign the contract within the time limit specified in the bidding documents. The general bid price is the contract price.


14. After the completion of the bidding work, the bidding unit shall submit the documents of the bidding documents and the meeting of the bid evaluation report, and a copy of the bidding documents of the winning bidder shall be submitted to the regulatory agency for the record.


How about, I read the relevant introduction to the decoration tender, and I also learned a lot about the decoration tender. I hope that you can learn more about home improvement knowledge through this article, and you will be able to create a more perfect home environment. Thank you for reading this article and your support and love for Xiaobian. If you want to get more information about home improvement, please continue to pay attention to the decoration home network.


More related wonderful reading:

What are the advantages of releasing decoration tenders in the decoration house? Be the real hand shopkeeper

Rebar Thread Rolling Machine is one of our main products. The more detail information as follow:


Machine Function 

It is mainly applied to peel rebar rib first, then roll parallel thread on rebar end, after that, two threaded rebar sectors could be connected by coupler.

It is a necessary machine for rebar joint. In addition, it is also applied to roll threads on round steel bar, anchor rod, or other equivalent materials.



Machine Advantages

1. Both right-handed threads & left-handed threads could be processed with one machine head.

2. Simple operation, reducing workers' labor intensity. 

3. Shortening construction period.High processing speed and production Efficiency.




Rebar Thread Rolling Machine


Rebar Thread Rolling Machine


Rebar Thread Rolling Machine

Rebar Thread Rolling Machine



Machine Parameters

Model


Rebar  Diamete


Max Thread Length


Thread Angle


Thread Pitch (mm)


Electrics


JBG-40K


14-40mm


65mm

60°/75°


2.5; 3.0; 3.5


380V/50Hz


JBG-40KI


14-40mm


65mm

60°/75°


2.5; 3.0; 3.5


380V/50Hz


JBG-40T


14-40mm
100mm

60°/75°


2.5; 3.0; 3.5


380V/50Hz


JBG-40F


16-40mm 300mm

60°/75°


2.5; 3.0; 3.5


380V/50Hz


JBG-50


12-50mm 100mm

60°/75°


1.75; 2.5; 3.0; 3.5


380V/50Hz



Product Features

1. It uses large machine rack which makes machine more stable.

2. It adopts famous brand reducer and motor, the machine performance is superior.

3. All the main parts need to be tested, the quality is better, the service lift is longer.

4. The thread precision is high, the conical degree is small, and the thread surface is smooth.

5. The machine is easy to operate. 


Rebar Thread Rolling Machine

Portable Rebar Threader,Rebar Threader For Construction,Metal Steel Thread Rolling Machine,Nail Thread Rolling Machine

BAODING JINDI MACHINERY CO., LTD , https://www.rebarconnectors.com

Posted on