Switch socket installation 10 experience sharing decoration without leaving regret

In the renovation, the switch socket is indispensable, but often it is inconvenient to use it in the future because there is no good planning before the renovation or too few switch sockets are reserved. The following Xiaobian will share the experience of 10 switch socket fittings. Get up!

1, socket should be more loaded, rather than lack of

Think about what you might buy in three years or even five years. If you use these winters, how are these winters used? Where do you plan to use them at home? Switch sockets to install knowledge. To install outlets and switches, the height of these parts should be high, and how they should be installed is the safest, but not everyone knows.

2, the socket must be considered in advance, our home was considered a lot of outlets at that time, can now be blocked behind the furniture, simply do not use! So it is recommended to look at the furniture first and then design it. Before the renovation, the furniture is basically set, the size and location are all determined, so that the socket is absolutely impossible to waste, but I think 99% of people can not do this, so there must be no socket after installation. Psychological preparation.

The socket on the back of the furniture, if installed high, one outlet is exposed, easy to use, it may not look so beautiful; if hidden behind the furniture, plugging inconvenient not to mention, a lot of electrical plug It is very long and your furniture has to be separated from the wall. It takes up space and it is easy to collect dust behind. The best way is to use the kind of furniture that doesn't have a back panel when there is a socket, so that both sides can take care of it.

3, due to ill-considered, there is no design of a dual control lights in the aisle, from the first open, but there is no way to close, this light has nothingness. The ceiling light of the bedroom is preferably double-controlled, one beside the door and one beside the bed, so as to save the winter and lie down on the bed and turn off the lights.

4, 2 eye socket more than some reserves, 3 eye socket less reserve. The five-eye socket does not have to be stocked as much, and the four-eye socket is mostly used in the living room and bedroom.

5, the wire should be selected according to the size of the power load reasonable cross section, lighting wire with cross-section 1.5 square mm insulated copper wire; ordinary socket with 2.5 mm2 section of insulated copper wire; air conditioning line should reach 4 square, otherwise use air conditioning, easy to overheating soft. It is best to use cooked glue line, strong corrosion resistance, to buy at big shopping malls.

6, air conditioning power outlet location is too low. Originally wanted it to be above the air conditioner, so that the wires would not have to be exposed, but I did not expect that the height would not be lowered after shifting. The air conditioning could only be loaded with it. As a result, the air-conditioning pipes occupied a lot of places on the wall. It's hard to see long. For this reason, it is suggested that the socket be installed at a right angle near the top of the wall and on both walls. This ensures that the sight of the wire also makes the tube very short on the wall.

7, 10A plug is not plugged into the 16A socket, can not be inserted in the end. So choose the socket when thinking clearly. It is best to go to the store to see how much the plug of the appliance you are buying is A, and come back to the outlet.

8, for the sake of safety, the top of the kitchen door, it is best to install a socket in order to put the gas alarm in the future, this must not be saved.

9, some sockets are more convenient to bring the switch, but like stripping, disinfecting cabinets, etc., the switch is useless.

10, can consider using a metal socket installed on the ground, usually flush with the ground, the foot can be a step on the pop-up socket, suitable for a large living room. Or sit under the dining table in the dining room to insert the hot pot (to prevent wires from moving when moving around).

Tips: More practical decoration knowledge, real scene with the shoot, please pay attention to the palm of this site (micro signal: mall_jia).

Switch socket switch switch socket installation switch socket purchase

  1. Shantui,Shanghai,Pengpu,Hebei,XuanGong,Inner Mongolia Dadi,Zoomlion series Bulldozer,Daifeng Pipelayer Maintenance Service and spare parts .
  2. Shantui,Degong,XCMG,LiuGong,XGMA,SDLG,Wheel loader,Grader,Road Roller and Spare parts.
  3. CCEC,DCEC,Weichai Steyr,Shangchai,Xichai,Engine Unit and Diesel Generator set and spare parts.
  4. Komatsu,Cat,Hitachi,Volvo,Case,Sany,XCMG,SDLG,Lishide,etc spare parts, Maintenance and Multi-functional parts.

Bulldozer Engine Parts,Bulldozer Hydraulic Parts,Bulldozer Electric Parts,Bulldozer Structural Parts, Bulldozer Bearing ,Bulldozer Undercarriage Parts,Bulldozer Seal Ring

We have rich experiences Maintenance Technical Engineer team,which means can provide Customs with highly efficiency Maintenance Services.In the past few years ,we have running the Maintenance services very well all over the world,solved the problems in time,because of our outstanding technical services for Bulldozer,Pipelayer,Excavator.
With the Independence Rights of  Imp&Exp,Our business have covered every part throughout the country.Under The Belt and Road Initiative,International business also has developed to Russia, CIS countries,Middle east area,South America,Africa etc

Bulldozer Engine Parts

Bulldozer Engine Parts, Dozer Diesel Engine Parts, Bulldozer Engine Component Parts C360, Bulldozer Engine Spare Parts C280, Dozer Engine Cummins 6Bt 4Bt

Jining Changsong Construction Machinery Co., Ltd. , https://www.jncsmachinery.com

Posted on