How to effectively avoid construction jerking in the decoration process

Doing decoration is the most afraid of construction units shoddy, cut corners, and such things in the decoration industry is also common, the victims are the majority of decoration consumers. So, how to avoid the construction unit shoddy, cut corners? As the owner, whether it is the inspection process before the renovation, or the decoration construction process must be aware of Qiu Hao.


1 Wall paint cutting corner cut points 1.5 points phenomenon: Latex paint is the most common wall decoration materials, in the specific construction can be painted, roller or spray. If the workers are not serious or perfunctory during construction, small color differences often occur. Especially with deeper emulsion paints, this problem is more likely to occur.
How to avoid the experts to remind: latex paint need to add a certain amount of water before use, deployment of a good latex paint to be used up once. Paints of the same color are also best painted once. If the wall needs to be repaired after construction, the whole wall should be repainted again.


2 Sewer cutting scores of 2 points in the sewage pipeline. Phenomenon: During construction, the construction team sometimes pours a lot of cement, sand and concrete into the sewers in order to cut corners. The direct consequence of this is a serious blockage of the sewer, causing the kitchen and toilet to run out of water due to poor water. Although some projects did not have major problems in the final acceptance, there were always problems with poor water.
How to prevent the expert from reminding: Strictly supervise the construction team and do not use the sewer as garbage road. After the construction of the waterway is completed, all the basins, basins and bathtubs are filled with water, and then water-proofed to see if the water is unobstructed and the pipeline is leaky.


3 wire joints cut corners 2.5 points phenomenon: electrician in the installation of sockets, switches and lamps, construction workers cut corners not according to construction requirements wiring. In particular, when consumers use some electric appliances such as water heaters and air conditioners that consume large amounts of electricity, the switches and outlets are heated and even burned, causing great losses to consumers.
How to avoid the expert reminder: In the construction of supervision of electricians in strict accordance with the operating procedures for construction, after all switches, sockets installed, must be the actual use, to see if these parts have a fever phenomenon.


4 The score of brickwork and wall-scraping for cutting bricks and tiles is 3 points. Phenomenon: Plastering bricks and tiles is a technically strong process. If workers cut corners, they are most prone to problems such as empty tiles, missing seams, and cement and adhesives used for laying tiles. If the ratio is unreasonable, there will be problems such as shedding.
How to avoid the expert reminder: According to the Beijing City Construction Committee promulgated the "family home decoration project quality acceptance standards," require that the tile wall tile should be flat and solid, clear patterns, no dirt and paste marks, the surface color is basically the same, uniform seams, plate No cracks, missing corners, and missing edges, local hollowing may not exceed 5% of the total.


5 Wall nicking and jerry cut index 3.5 points Phenomenon: The buried pipeline must be slotted on the wall and ground in order to bury the pipeline. A few workers perform barbaric construction during the grooving operation, which not only damages the building load-bearing structure, but also may cause damage to other nearby pipelines.
How to avoid the expert reminder: Before construction, we must reconfirm the direction and location of the pipeline with the construction team leader. For different wall structures, the requirements for slotting are not the same: the walls of the load-bearing wall in the house are not allowed to be slotted, and the wall with the insulating layer is easy to cause cracking on the surface after being slotted, and on the ground Slotting, but also be careful not to damage the floor, causing trouble to the residents downstairs.


6 joint modification and cutting points 4 points phenomenon: In some of the wall and the door, the docking of the window, and the docking of two different colors of paint, it is also where workers often perfunctory. You will often see mixed paints between latex paint and wood, with various problems at the joints.
How to avoid the expert reminder: It is very important to deal with the joints, you must supervise the workers to seriously construct. Never cut corners If there are two colors of paint on the wall facing each other, tape must be applied to the edge of the first color during construction, and another color of paint must be applied to it. After tearing off the tape after the construction, the entire seam can be very neat.


7 wire cut pipe cutting corners score: 4.5 points phenomenon: In the home renovation construction, almost all the wires are worn in the PVC pipe, buried in the wall. Therefore, after the electric wire is put into the PVC pipe, the consumers cannot see it at all and it is difficult to replace it. If the worker is not careful in the operation, it will cause the wire to kink in the tube, causing electricity hazards. If the workers intentionally cut corners, they would use wire with connectors or put several wires in the same PVC pipe.
How to Avoid Expert Reminder: Consumers are advised to purchase their own wires, and then supervise workers' operations at the site, and conduct power-on inspection after installation. In addition, consumers must allow the decoration company to leave a "pipeline map." When the electrician had just buried the wires in the wall, he could number the walls and draw a floor plan. Then he used the strokes to draw the direction of the wires and the specific location of the wires, indicating the position on the floor, the ground and the adjacent wall. In particular, the position of the joints of the pipelines should be marked so that in the event of a fault, the line position can be found immediately.


8 Facet Dealing with Stealing and Cutting Points: 4.5 points Phenomenon: The so-called “small face” is a small place that some consumers can't see and can't pay much attention to, such as the upper edge of the door, the underside of the window sill, and the inside of the heating cover. In places such as this, some workers will cut corners and cut corners, and will even do nothing.
How to Avoid Expert Reminder: Remember that there are 6 planes for any object and do not ignore any details when checking the quality of the project.


9 Ground leveling and cutting points: 5 points Phenomenon: Some houses are not well-grounded and need to be re-leveled during the renovation. If the workers are not careful or intentionally sloppy, it will cause the problem of “more and more unevenness”, and the cement mortar used in construction will also greatly increase the ground load, causing hidden dangers to the safety of the building.
How to Avoid Expert Reminder: Before ground leveling, ground surface treatment must be done first, and then use cement mortar to level the ground. After the cement is dry, determine the flatness of the entire floor using a dedicated level ruler, and then proceed to the next step.


10 Substrate disposal and cutting points: 5 points Phenomenon: Before applying the latex paint and paving the tile, be sure to do the substrate treatment. Some workers cut corners and cut materials in this regard during construction, and the unevenness caused uneven wall surface. After the paint is applied, there is a color difference. When the paint is applied, the paint is discolored and peeled off, or the ceramic tile is not firmly bonded.
How to prevent experts from reminding you: In the paving construction of tiles, you should pay attention to the fact that ceramic tiles cannot be laid directly on the surfaces of lime mortar, lime paste, paper lime plaster, hemp stone mortar and latex paint. Can be laid after clean. Bonding pastes used between tiles and substrates should be formulated in strict accordance with the construction standards and proportions, using the specified grades of cement and adhesive materials, and they cannot be randomly deployed.
When applying latex paint, you must pay attention to whether the shading of the wall putty is even and smooth, whether the sanding and rolling are in place. In addition, you should pay attention to whether the latex paint is properly proportioned.

Three Trees Lacquer Facade Lacquer Paint Lacquer Cement Paint Switch Toilet Tile Color Toilet Waterproof Toilet Tiles Bathroom Tiles Bathroom Doors Tiles Tiles Kitchen Tiles

Plastic Products

Plastic Products,Plastic Items ,Plastic Material ,Plastic Raw Material

Stainless Steel Wire Mesh Co., Ltd. , http://www.nblockers.com

Posted on