How to better implement the interior wall coating construction process?

Jc001.load('iframe') JIFrame.create({ 'url' : '/go.php?action=ads&iframeHeight=250&isIframe=1&key=%CD%BF%C1%CF&pos_id=jc001_news_detail_30&reqkey=1&style=margin%3A15px+15px+ 25px+0%3B+height%3A255px%3Bwidth%3A255px%3B+float%3Aleft%3B', 'height' : 250 })

With the continuous improvement of our living standards, our requirements for home decoration are getting higher and higher. A good decorative effect has certain requirements in addition to the quality of the decorative materials, and construction also plays a vital role. . Today, Xiaobian will introduce the construction process of interior wall paint.

In the process of decoration of our home walls, many of them use interior wall paint. The advantage of the construction of interior wall paint is that the operation is not complicated, it is very simple, and at the same time, it has different color tones, and the wall after decoration. Very simple style.

First, interior wall coating construction material requirements

The interior wall paint coating should be dry and free of dirt. For the maintenance of cement wall surface for more than one month, the humidity should be below 6%, the surface humidity of wood material should be below 10%, and the wall surface for construction should be free of water seepage cracks; all the adhesion of its surface Clean things with dirty objects.

Second, interior wall coating construction conditions

It is a water-based paint, so the conditions for construction and maintenance are also very high. The temperature during construction and maintenance should be higher than 5 degrees Celsius, and the humidity of the environment should be below 85%, which makes it better. The film is formed on the ground. Generally speaking, the maintenance time should be seven days. The temperature should be kept at a low temperature as much as possible. At the same time, the external wall is constructed. In the process of construction, the external objective factors such as the weather are considered. During the period before the latex paint is applied, there should be no rain within 12 hours, and the humidity of our paint construction and maintenance should not be too low, especially the two-component reactive coating, when it is at low temperature. The state of the film will become slow, the time required will increase, and it will not rain again after 24 hours to prevent the paint film from being damaged by rain.

Third, the interior wall coating construction process

To ensure the effect of painting, we should have a relatively refined level of operation, to ensure that the substrate of our construction process is free of dirt and is very strong, in accordance with the instructions, in accordance with the conditions of the paint construction, Make sure that the diluted portion is accurate, because when the proportion of dilution is greater, it is easy to occur that the coating does not cover the bottom. At the same time, if the coating is shiny, the gloss will be lowered, the bottom surface should be smooth, and the construction tools are good. The ceiling is painted first during the construction process.

Before applying the paint, we must first stir it according to the instructions. If we use the same color but different paints and apply it on the same painting surface, we should Select a larger container and mix them together to stir evenly so that the whole can be well docked without a large chromatic aberration.

Processing Agent

Processing Agent Ht-617 ,Processing Agent Ht-A,Ht-617 Processing Agent ,Non-Toxicity Processing Agent

Jiang Xi Hi-Tech Technology Co.,Ltd. , https://www.hi-techmasterbatch.com

Posted on