"Six Tips and Nine Details" for the purchase and construction of waterproof materials

Many consumers react to the problems of water pipes blocked and water seepage in the roof. In fact, these problems must be paid attention to when decorating. We must kill this dangerous existence in the cradle. . Professionals give you advice, purchase and construction of waterproof materials should pay attention to the "six tips and nine details."

Six tips:

First, the thickness of the waterproof layer should be enough.

Second, when choosing, choose brand products with high reputation, good reputation, high degree of anti-counterfeiting, and international quality system certification.

Third, the waterproof parts should be comprehensive, the ground floor and all wall surfaces of the basement should be waterproof and moisture-proof.

Fourth, the construction process should be meticulous: the seam between the wall and the ground, the yin and yang angle, the water pipe, the floor drain and the surrounding of the sanitary ware and the trench in the cold and heat pipe are the key waterproof parts.

5. Closed water experiment after completion: After the construction is completed, seal the door and the drain, and store the water for 24 hours indoors to check if there is any leak.

6. If leakage is found, it should be remedied in time.

Nine details:

First, the ceiling should choose waterproof, anti-corrosion and anti-rust materials.

Second, the waterway transformation: the drainage and drainage lines are best not to make too much changes.

Third, the ground: be sure to do waterproof before laying the floor tiles; to ensure that the brick surface has a slope of water (generally about 1%), the slope is facing the floor drain; after the paving, you must do at least 24 hours of water shut-off experiment; pay attention to the floor tiles It is seamed and aligned with the wall tiles to ensure a sense of integrity.

Fourth, the wall: wall tiles should also be waterproof, tiling should be ensured to be flat, and the floor tiles are seamed and aligned; when encountering the water supply pipe outlet, the tile cuts should be small to ensure a perfect appearance.

5. Door: The door boundary should be slightly higher than the inner side of the bathroom; the gap with the ground should be large to facilitate the return air; if it is a sliding door, the door and the floor tile should be waterproof.

Sixth, the circuit laying: the wire joints must be wrapped with waterproof tape and insulating tape; the wire body must be covered with flame retardant pipe; all switches and sockets must have a moisture-proof box.

Seven, sanitary ware installation: It is best to install the sanitary ware according to the size before the decoration, and choose the sanitary ware according to the size; the toilet should be sealed with the toilet mud first, and then fixed with the expansion screw or glass glue to facilitate the repair when the clogging occurs.

8. Ventilation and ventilation: The exhaust fan must be equipped with a reverse gate to prevent the dirty air from flowing backwards.

Nine, green: choose a potted plant that is resistant to yin and wet, which can add vitality.

Oushida is second quality machine,but the quality also similar with longneng quality.only different is the Motor material. Longneng is 45# baosteel cold-rolled.Oushida is 60# cold-rolled baosteel.608 bearing use C&U.another one is scnc, another is CHL.

We have self machinery room to control the aluminium allowable error.We also removal the dust that every process machining to control no more tolerance on the spare.

There is testing room to control the quality stable.

OUSHIDA/WSLN Rotary Hammers

OUSHIDA Rotary Hammers, OUSHIDA Rotary Hammer Drill, Cordless Rotary Hammer Drill, Air Rotary Hammer Drill, Pneumatic Rotary Hammer Drill

Yongkang Longneng Power Tools CO., LTD. , http://www.longnengtool.com

Posted on