Model NO.: AV2004
Number of Handles: Single Handle
Function: Induction
Purified Water Outlet: Without Purified Water Outlet
Hot and Cold Water: Cold
360 Swivel: Not Rotatable
Installation Type: Wall Mounted
Surface Color: Nickel, Golden
Raw Material: Zinc/ Brass
Work Pressure: Pn16-25
Inner Ball Material: Iron /Brass
Trademark: ITALY
Transport Package: Standard
Specification: 1/2"M
Origin: Zhejiang. China
HS Code: 8481909000
Forged Brass Water Bibcock with Hose Union(AV2004)Material:Brass CU>57%, Pb<2.5%
Size: 1/2" BSP, NPT also can be done
Medium: Water, Oil
Pressure: PN16-25
Treatment: Forging-polishing-plating
Quality guarantee: 5years guarantee
*Process: Forging, plating
ITEM | Designation | Materials  |
Packing& Delivery |
 * |  Handle |  Steel Q236 | Plastic bag, inner box , carton or customized |
 * |  Body |  Brass Hp59-1 according to EN12165 Nickel | |
 * |  Ball |  Brass CW617N according to EN12165 Chromed | |
 * | Hose& Nozzle |  Stainless steel 304 | Delivery time: within 40days after get deposit |
* | Nut  |
Brass /iron | Â |
* | Stem | Brass/Iron | Â |
BIBCOCKS
OUR SERVICES: OEM&ODM&EXPORTING
Samples:
1) we can make the samples according to customer's samples or designs.
2) Our designer team can finish the samples timely, the exact sample delivery time depends on thesample's style, usually in 15 working days.
3) For New design samples, the buyers have to pay for the relative model fee. (When your order reach a certain amount, we will return back the model fee to you
Price Terms:
FOB, CNF,CIF.etc.
WE ACCEPTÂ MANY RATE , SUCH AS RMB, US DOLLAY, EUR, KORAD, POUND..ETC
Payment Terms:
1) T/T, 30% T/T deposit before production, pay the balance before shipment.
2) L/C at sight (for large quantity order)
3) 100% T/T in advance,  D/P
Order and Mass Production:
1) We will send PROFORMA INVOICE to you when the order is confirmed.
2)Â We will start to have mass production when confirm our sample and 30% T/T deposit received.
3)Â Quality is under the control and supervision during the production.
4)Â Packing information will be confirmed before the production finished, If no special requirment, using our normal package.
Quality control and inspection:
1)Â Will be check by QC when Material & accessories inspection up arrival
2)Â In line control on Each Step
3)Â Every one valve will be comprehensive review before packing
4) Sales will be spot check before shipping
5)Â Third Party inspection Such as CE, SABS and so on
6)Â Original authorization through ISO9001:2008
Laser Tape Measure Menards,Laser Tape Measur,Laser Measuring Stick,Laser Tape Measure Lowes
Zhongrui Tools Co., Ltd. , https://www.zhongruiglj.com