Winter 2016 Coal Mine Safety Protection Measures

News Related Keywords: No tags.

In order to ensure the safe wintering of mines and ensure the safety production of mines and the healthy life of employees, according to the document spirit and relevant requirements of the local government and the higher authorities on solidifying and coping with the cold freezing weather, combined with the actual situation of our mine, the following coal mine winter safety measures are specially made.

First, the target mission

We will further strengthen safety production, consolidate the achievements in the establishment of safety quality standardization, inspection and control of hidden accidents, and special rectification and inspection of safety activities, implement safety production responsibilities, strengthen supervision and inspection of safety production, counteract three kinds of violations, and prevent winterization, freezing, fire, and slippage in winter. "Anti-gas poisoning," the work mentioned on the agenda, early arrangements, early deployment, early action, and actively take effective measures to eliminate fire accidents, eliminate serious injuries caused by fire and more accidents; safe and rational use of electric ovens, coal stoves Prevent the occurrence of electrical fires and gas poisoning accidents; use industrial salt, sand and water pipes to wrap thermal insulation materials outside the pipeline to ensure the safe operation of vehicles, the smooth flow of water supply pipes, and the absence of roof falling from the wellbore.

Second, organization and leadership

In order to strengthen the leadership of the mine's “cold protection, freezing prevention, fire prevention, anti-skid, and gas poisoning prevention” work in winter, the leading group of the mine safety production team has decided to establish the leading group of “cold protection, freezing prevention, fire prevention, anti-skid, and coal gas poisoning” in winter.

1 , institutional composition

group   long:

Deputy head:

to make   member:

The leading group has an office under it, and the office is located in the logistics department. It is responsible for the organization, coordination, guidance, inspection, and assessment work of the winter “cold protection, freezing prevention, fire prevention, anti-skid, and coal gas poisoning” work.

Safety Mine Chief 24 Hours:

Ground mine manager on duty 24 hours:

Mine dispatch office 24 hours on duty call:

2. Division of responsibilities

The team leader is fully responsible for the work of winterization, freezing, fire prevention, anti-skid, and coal gas poisoning in winter and solves the people, finances, and materials needed for the work of “cold protection, freezing prevention, fire prevention, anti-skid, and coal gas poisoning” in winter; the assistant team leader assists the team leader. Do the daily work of “cold protection, frost protection, fire prevention, anti-skid, anti-gas poisoning” in winter; the logistics department is responsible for the arrangement, balance, and winterization of daily “cold protection, anti-freezing, fire prevention, anti-skid, anti-gas poisoning” and “freezing in winter, freezing, fire prevention, anti-slip , Anti-gas poisoning work supervision and inspection and the implementation of various measures; other sections (room) according to the mine winter "cold protection against freezing, fire prevention, anti-skid, anti-gas poisoning," the overall arrangement, do a good job in the jurisdiction of the area within the "cold Antifreeze, fire prevention, anti-skid, anti-gas poisoning related work.

The leading group shall strengthen the leadership on duty and do a good job in the winter “cold protection, freezing prevention, fire prevention, anti-skid, anti-gas poisoning” emergency response; pay close attention to weather changes, especially the cold and snow-cooling weather, make cold-prevention in advance and large The preparations for snow and snow cooling and snowfall weather eliminated the potential accidents caused by inclement weather and ensured safe production in winter.

Third, strengthen the publicity and education of “cold protection, frost protection, fire prevention, anti-skid, anti-gas poisoning” in winter

In winter, “cold protection, frost protection, fire prevention, anti-skid, and anti-gas poisoning” work related to the life and property safety of all mine workers and the harmonious and stable development of mines. It is necessary to attach great importance to the work of “cold protection, freezing prevention, fire prevention, anti-skid, and coal gas poisoning” in winter. While arranging normal work, this work is taken as a major task, and the significance of the work of preventing cold, freezing, freezing, fire, slip, and gas poisoning in winter and the prevention of disasters are vigorously promoted in the form of posters, placards and various meetings and other forms. Knowledge, diligent visits, diligent inspections, timely formulation of rectification measures, and implementation of various potential rectification measures.

At the same time, in order to allow the cadres and workers to attach importance to ideological considerations, we must actively promote the “cold-freezing, fire prevention, anti-skid, and coal gas poisoning” publicity campaigns in the winter, and constantly enhance awareness of prevention, improve the staff's self-protection capabilities, and ensure the safe wintering of mines.

Fourth, the work focus

1. Electromechanical and electromechanical teams: Periodically inspect and overhaul equipment and facilities such as staff quarters, offices, and groundwork heating equipment, bathhouse boilers, power supply lines, and backup generators to ensure normal heating and bathing of staff and workers, and wellbore heating equipment and facilities Purchasing and installation (subject to specific circumstances to be determined); conducting comprehensive inspections on substations, power supply lines and communication lines in mining areas, preparation of emergency materials, and preparations for emergency repairs due to bad weather and power supply and communication interruptions.

2. Logistics Section, Supply Section, and Administration Section: Responsible for the supply and distribution of staff quarters, bathhouse heating equipment, materials, ground water supply facilities, frozen ground, industrial salt, ground deicing, and snow removal. Frequently check the fire-fighting facilities in offices, staff quarters, warehouses, winch houses, main fan rooms, gas drainage pump rooms, substations, and other key parts to ensure that the fire protection facilities are in good condition; use of electric furnaces and coal is strictly prohibited in key parts of winter heating. Furnace and high-power consumption equipment for heating; strengthen the patrol of the mine from time to time; wellhead room strict implementation of the system to prevent wells from entering the well. At the same time, it will strengthen the publicity and education of employees' safety knowledge of “cold protection, freezing prevention, fire prevention, anti-skid, and coal gas poisoning” in winter, increase safety awareness, ensure everyone’s awareness, and everyone understands precautions and preventive measures.

3. Safety Section and Production Section: Regular inspections shall be conducted on production sites, and when hidden dangers are discovered, corresponding measures shall be formulated to ensure safe production of the mines.

Responsible for the wellbore deicing, production system water supply pipe ( into the well pipe, hydraulic pipe, ground hydraulic pump station, etc. ) insulation, supervise the construction team to do winter "freezing, freezing, fire prevention, anti-skid, anti-gas poisoning" work.

4 , Tongfang Branch: Strengthen the winter mine fire prevention and extinguishing work. The first is to prepare a certain number of fire-fighting equipment, and regularly check the fire-fighting facilities, find problems in a timely manner, and second, we must further increase the monitoring of fire prevention.

V. Work Safety Measures for Cold, Frost, Fire, Non-skid, and Coal Gas Poisoning in Winter

(a) Fire prevention measures

1 , the ground fire:

( 1 ) In order to prevent ground fires caused by electrical short circuits, the Electrical and Mechanical Services Department and the Logistics Department shall conduct a comprehensive inspection of the ground living and power supply lines and facilities. The living quarters, office areas, and machine rooms shall not be disorderly, damaged, exposed, or have poor insulation. The power supply line must not use faulty or unsafe electrical equipment (eg, electrical equipment that is prone to leakage, short circuit, and poor insulation); and check the protective device of the control switch to ensure its sensitive and reliable performance.

( 2 ) It is forbidden to use electric furnace or high-power electric heating equipment of 1000W or more in the dormitory .

( 3 ) Organize employees to learn fire prevention knowledge, strengthen safety awareness, and prevent and control fires.

( 4 ) When using coal stoves for heating in office places and dormitories, use a good chimney, cover the lid at any time, and open the windows to prevent gas poisoning during breaks.

( 5 ) Keep flammable items at a safe distance from the fire source.

( 6 ) It is prohibited to smoke in bed.

( 7 ) When electric welding and gas welding operations are performed in an electromechanical maintenance room, it is necessary to cool the welding slag in time with water; it is forbidden to perform electric welding and gas welding operations at the wellhead.

( 8 ), Electrical and Mechanical Section, Security Inspection Division to strengthen supervision and inspection, is strictly prohibited to pull the private wire pulling, to prevent fire, electric shock and other accidents.

( 9 ) The ash burnt in boiler rooms and canteens must be washed away with water before being transported to the garbage dump.

( 10 ) It is strictly forbidden to smoke in open pits, prohibit the use of open fire for heating, and provide enough fire extinguishers.

( 11 ) The amount of ground fire pool must be sufficient, and the water pump, fire hydrant and soft water pipe fire protection facilities must be fully equipped.

( 12 ) Key wintry places such as winch room, pressure fan room, gas drainage pump room, main fan room, light room, power distribution room, and warehouse must be equipped with a sufficient number of fire extinguishers and fire sand, and timely replace the fire extinguishers that have failed. .

( 13 ) All personnel in key locations must be familiar with the use of fire extinguishers and be familiar with the location of the fire fighting equipment in the area.

( 14 ) The ground fire protection material library must be set up. The fire protection material library must be located near the wellhead and there is a track to the wellhead, but it must not be located in the wellhead room; the types and quantities of materials and tools stored in the fire protection material library should comply with relevant regulations. , And regular inspection and replacement, fire-fighting materials and tools shall not be used for other purposes.

2 , underground fire protection:

( 1 ) Strengthen the management of the wellhead inspection work. It is forbidden for the personnel entering the well to wear chemical fiber clothes and carry ignition items.

( 2 ) Strengthen the management of downhole electrical equipment and prevent the explosion of explosion equipment and the explosion of equipment in use.

( 3 ) No live repair or relocation of electrical equipment and cables is allowed.

( 4 ) Perfect all kinds of protection of underground electrical equipment, and frequently check the use of various protections. It is strictly prohibited to get rid of the phenomenon of protection without electrical equipment.

( 5 ) Reasonably set the protection value of the downhole leakage relay protection.

( 6 ) Conduct a thorough inspection of the downhole grounding facilities to ensure that the grounding resistance, wiring body, and conductor cross-section meet the requirements of the "Coal Mine Safety Regulations."

( 7 ) Gasoline, kerosene and transformer oil used underground must be enclosed in tight iron drums and transported by special personnel to the place of use. The remaining gasoline, kerosene and transformer oil must be transported back to the ground. It is forbidden to store underground; underground use is prohibited. The lubricating oil, cotton yarn, cloth head and paper must be stored in tightly-jacketed iron drums and sent to the ground by special personnel. It must not be littered; it is strictly forbidden to spill the leftover oil and waste oil on the lanes and alleys; When the pneumatic tools are cleaned downhole, they must be carried out in a dedicated chamber and must use non-flammable and non-toxic detergents.

( 8 ) Underground firefighting material library must be set up. The downhole firefighting material library must be installed in the bottomhole transportation alleyway, and fire-fighting trains should be equipped. The types and quantities of materials and tools stored in the firefighting material library should comply with relevant regulations and be regularly Inspection and replacement, fire-fighting materials and tools shall not be used for other purposes.

( 9 ) It is necessary to conduct a comprehensive inspection of the installation of the firefighting pipeline system, fire doors, fire protection material library and fire-fighting equipment. The problems should be discovered and dealt with promptly.

( 10 ) Fire-fighting pipeline must be unblocked, and the amount of water in the surface fire-fighting pool must ensure normal water consumption.

( 11 ) A sufficient number of fire extinguishers and fire-fighting sand must be installed at the underground substation, pump room, and equipment installation sites.

( 12 ) Downhole workers must be familiar with the use of fire extinguishers and be familiar with the storage location of fire fighting equipment in their own area.

( 13 ) It is forbidden to use bulbs and electric stoves to keep warm in the underground.

( 14 ) The junction box must be used at the cable junctions. Chicken paws, Ming connectors, and sheep tails are strictly prohibited.

( 15 ) The cable must be fully inspected and found to have damaged or aged gel cables to be disposed of or replaced in a timely manner.

( 16 ) Underground shall not be engaged in welding, gas welding and torch welding. It is strictly forbidden to use open flame heating within 20 meters of the wellhead .

(B) anti-gas poisoning

1. In the winter, members of the “cold protection, anti-freezing, fire prevention, anti-skid, anti-gas poisoning” team members should regularly and irregularly check the staff quarters and immediately handle the problem once they are found.

2. Employees should always open front and rear windows for convection and ventilation.

3. Each team shall use the learning day to publicize anti-gas poisoning knowledge to employees.

4. When using coal stoves for heating in office places or dormitories, use a good chimney and cover the lid at any time. When the rest breaks, open the windows to prevent gas poisoning.

(All coal-fired furnaces in the mining area must be approved by the mining logistics department and registered, and unauthorized use of coal-fired boilers for heating is prohibited. )

5 , it is forbidden to pull the wire privately.

6. Strengthen safety awareness and prevent gas poisoning accidents.

(C) Cold and Frost Protection Measures

1 , wellhead

( 1 ) Strengthen the inspection of the ground track and wellhead platform, and use an overhead manned device to clean the snow in a timely manner. Deicing should be carried out in a timely manner at the icing site.

( 2 ) The main inclined shaft and auxiliary shaft wellbore should remove debris in time, clear the snow and water, prevent ice formation, and prevent the roof falling from the top of the roadway.

( 3 ) Main and auxiliary wellheads, wellhead signal rooms, inspection houses, workshops, dormitories, offices, canteens, bathhouses, garages (such as winch room, pressure fan room, main fan room, substation, power distribution room) Etc.) Electromechanical and electromechanical teams shall arrange for uniform installation of heating facilities ( explosion-proof heating electrical equipment shall be used in locations within 20 meters of the wellhead ).

( 4 ) It is not allowed to stop the winch operation for a long time. If there is a long-term stoppage, anti-icing measures shall be taken to ensure the normal operation of the equipment; once it is frozen, it must be operated after breaking the ice.

( 5 ) Wellheads should be equipped with hand tools, sledgehammers, and brazing tools, and water heaters should be installed to break ice.

( 6 ) The road leading to the wellhead must be cleared of snow and water in a timely manner to prevent ice on the ground and on the steps; if it is frozen, it must be cleared in time to prevent personnel from slipping.

( 7 ), workshops, dormitories, offices, canteens, bathhouses, garages (such as winch room, pressure fan room, main fan room, substation, machine repair shop, etc.) timely replacement of damaged doors and windows, glass, heating or air conditioning, etc. Heating equipment for heating.

( 8 ) Heating must be prevented and prevented from freezing in time in order to ensure that the temperature below the wellhead is not lower than 4 °C (Celsius).

( 9 ) Put the water in the monolithic hydraulic props stored on the ground and use a canvas shed to clean the snow in time after snowfall.

( 10 ) The thermal insulation materials (rock wool products, aluminum silicate products) for the water supply pipeline shall be tightly wrapped and shall not be exposed.

2. Living area

( 1 ), living quarters, pre-class meeting rooms, study rooms, meeting rooms, restaurants, etc. are air-conditioned or heated for heating.

( 2 ) Warming the water supply pipes.

( 3 ), the tap can be a small amount of water at night to prevent frozen valves.

( 4 ) Water that has not been used for a long period of time.

( 5 ) Listen to the weather forecast regularly, reserve a certain amount of living materials before snowfall, and take effective measures to ensure that employees eat hot meals and hot dishes.

( 6 ) Plastic shower curtains should be installed in bathhouses, canteens, and main office spaces.

( 7 ) Repair the backup generator and prepare enough diesel.

( 8 ) Equipping ground staff and workers with warm clothes and warm daily goods .

(D), anti-skid measures

1. Accumulation of water around wellhead rooms and wellhead rooms is strictly forbidden. If there is accumulated water, remove water in time to prevent it from freezing and slipping.

2. When it is snowing, arrange special personnel to sweep the wellhead, ground track, and snow on the platform to prevent people from sliding.

3. Strengthen safety inspections on the wellbore, wellhead, gondolas, and derricks, and detect icing, and deal with it immediately.

4. If the roads in the mining area and the mining area are frozen and covered with snow, industrial salt and sand shall be disposed for disposal.

5. When the coal mine car travels, it is necessary to prepare a snow chain for emergency use.

6. When the overhead passenger device is frozen, it is forbidden to take the monkey car.

The information in this article comes from the Internet and was reorganized and edited by China Rescue Equipment Network.

The gabion net is made of mechanically braided high-corrosion-resistant, high-strength, ductile low-carbon steel wire or the above steel wire covered with PVC. The box structure made using this net is a gabion net box. According to ASTM and EN standards, the diameter of the low carbon steel wire used varies according to engineering design requirements. Generally between 2.0-4.0mm, the tensile strength of the Gabion Mesh wire is not less than 38kg / m2, the weight of the metal coating is generally higher than 245g / m2, and the diameter of the edge line of the gabion mesh is generally greater than the diameter of the mesh. The length of the twisted part of the double wire should not be less than 50mm. In order to ensure that the metal coating and PVC coating of the twisted wire are not damaged.
(1) Aperture: 60 * 80mm, 80 * 100mm, 80 * 120mm, 100 * 120mm, 120 * 150mm, 90 * 110mm
The length of the twisted part of the double wire must not be less than 50mm. To ensure that the metal coating and PVC coating of the twisted wire are not damaged.
(2) Wire diameter: The gabion net is divided into three wire diameters-mesh wire, edge wire, and tie wire.
1.The range of the mesh is 2mm-4mm
2. The edge wire is generally larger than the mesh, 0.5-1.0mm thicker than the mesh
3. The tie wire is generally smaller than the mesh wire, and the most common is 2.2mm.
(3) Wire tension: not less than 38kg / m2 380N / mm
(4) Surface treatment
1. Galvanized. The amount of zinc added was 10 g / m2. Poor corrosion resistance
2. Hot-dip galvanized. The amount of zinc can reach 300g / m2. Strong antisepsis
3. Gao Erfan (zinc aluminum alloy). This is divided into two materials, zinc-5% aluminum-mixed rare earth alloy steel wire and zinc-10% aluminum mixed rare-earth alloy steel wire. Super corrosion resistance
4. PVC coated. The thickness of the plastic package is generally 1.0mm, for example: 3.7mm after packaging. Strong anti-corrosion
(1) Partition: Add one partition per meter in the long direction of the gabion net
(2) Size: can be customized according to standards
(3) Contrast range of aperture and wire diameter

Gabion Mesh

Gabion Wire Mesh,Gabion Baskets Lowes,Gabion Fence Panels,Gabion Basket Fence

Jieyang Xinxin Industry and Trade Co., Ltd. , https://www.gdxxgm.com

Posted on