Experts explain the new house acceptance 15 strokes

Before the arrival of a new home, if there is no expert to accompany it, how can ordinary homebuyers check their own homes? Please see the expert for your detailed explanation.

The first move: see "record" to stay "two books"

Before the new home stays, the owner should see a copy of the project's filing documents in order to confirm that the project is a legal building; at the same time, the developer should provide the “Residential Quality Warranty Book” and the “Home Use Instruction”.

The second stroke: The bathroom does not seep

Check whether the floor of the bathroom is leaking. You can use plastic bags filled with sand to place on the floor drain, and then store some water in the bathroom. After 24 hours, go to the corresponding lower bathroom to see if there is any leakage at the top. This test is best performed at the same time as the upper occupants, so that it can detect whether there is leakage on the floor of their own bathroom or whether there is leakage on the top of their own bathroom.

Check whether there is water on the bathroom floor, but also store some water in the bathroom first, and then release water to see if there is water accumulation on the ground. There should be no stagnant water on the qualified ground, because the floor drain is the lowest point of the toilet. However, except for the rough house, there is a certain height of the post-drainage ground around the floor drain.

3rd trick: doors and windows are flexible and bright

Try to see if doors and windows can be opened flexibly, visually check if the doors and the door frame, the sides of the window and the window frame are parallel, close the doors and windows to hear the sound insulation effect, and also understand the degree of their sealing. However, the door of the bathroom does not require strict seams. In order to waterproof, it is specified that the bottom must be 1.5 cm above the ground.

The quality of paint on doors and windows depends mainly on whether there is a falling stream (a trace of paint dripping). The top of each door must be painted and the door of the bathroom must be brushed on the other side.

4th trick: tap the surface to hear the crack

Whether there is cracking in the plastering of the wall, the floor decoration surface layer and other decorative surface layers, just use a small hammer to gently knock. If you hear the voice of “empty”, it means that each surface layer is in contact with the wall (ground) surface and needs to be reworked; if you hear a dull knock, it means that they are in good contact.

5th move: Top-level households check for rain

If you are buying the top floor, be sure to check the top surface of each house for signs of rain leakage. Because according to the construction requirements, the houses handed over have either passed the “test” of two heavy rains, or the construction party has conducted rain tests under the supervision of the supervision unit.

6th trick: large balcony crack risk

In general, the cracks in the wall are mostly not structural cracks, affecting the appearance, but the danger is not great. Problems with the structure of the house often appear on the balcony. If there is a crack in the connection between the room and the balcony, it is likely to be a sign of the breakage of the balcony. The relevant unit must be notified immediately.

7th trick: bad insulation wall dripping

In winter, if there is condensation in the walls of the room (similar to the summer iced bottle beer and water droplets appearing on the outside wall at room temperature), there must be a problem with the wall insulation.

8th trick: open the leader check leakage plug

There is no seepage, leakage, or blockage in the upper and lower water pipes. It should be noted that as much as possible, let the water flow be a bit larger and anxious. Let's take a look at the water pressure and try the drainage speed.

The 9th trick: Heating pipe with a gradient

The heating supply and return branch pipes are not horizontally arranged. The water supply branch pipe is connected to the water pipe at the end higher than the end that connects the radiator. The water return branch pipe has the opposite height at both ends. This slope is proportional to the length of the two branch pipes. Generally 1% difference per meter.

10th trick: heating pipe to be casing

The heating pipeline shall be provided with a casing through the wall and through the floor (in the intersection of the pipeline and the wall or floor, a small pipe shall be put on the pipeline). The casing on the ground shall be 2-3 cm above the ground, and the ground shall be The decoration should be 5 cm above the ground. Its role is to prevent the heating pipes from swelling and shrunk and then arching the walls and floors.

The 11th trick: pull off power can not be less

When the gate and meter are outdoors, they should check whether they can control the indoor lamps and the indoor outlets. After the gate is turned on, whether the indoor power is completely turned off; if the gate is open, the gates should also be checked separately. Control each branch line.

Twelfth stroke: insurance outlets to protect young children

In order to prevent young children from putting their fingers into the socket, the socket must be equipped with a safety device that is located at a height of 30 cm from the ground.

The 13th trick: bathroom socket rules more

The power outlet in the bathroom shall be a moisture-proof socket with splash-proof measures. The lighting lamp holder of the bathroom must be a safe lampholder with a magnetic port. There should be no socket above the wash basin.

14th trick: kitchen and toilet close to the ventilation

The kitchen and toilet should be arranged near the air passages, which will facilitate the rapid discharge of odors, exhaust gases, etc., and keep the indoor air clean.

15th trick: switch interface pull a pull

Check the firmness of the switches and sockets. Don't forget to open the line interface of the phone and TV. Pull it hard and see if it is a virtual one. Cai Xueying

Home Inspection Balcony Windows Doors & Windows Heating Paint Housing Bathrooms Waterproof Toilets Washbasins Bathroom Doors

This classification including seamless Square Steel Tube, seamless Rectangular Steel Tube and seamless circular Steel Tube, usually they are used for contruction purpose, also some customer use them for car , billbord, stents, fence etc.

Jinan Xin Jiyuan Special Section Tube Co., Ltd. is the holding company of Jinan Xin Fangyuan Special steel tube Co., Ltd. founded in 1997. Our companies located in Dawei Industrial park, north end of Second Ring Road, Jinan City, Shandong Province, closed to Beijing-Shanghai expressway exit, transportation is very convenient, and also have a good production and operation environment.

Our company purchased three production lines at the cost of over 16 million for expansion of the new factory; they have been gradually put into operation. These production lines make full-sizes of square tubes and rectangular tubes: 20x20 -600x600 square tubes, 20x30 - 400x800 rectangular tubes, Thickness: 1.5mm to 32mm, over 2800 kinds of specifications, Material: Q195, Q215, Q235, Q275, Q345, 20#, 45#, stainless steel, seamless pipe, alloy steel etc. We could produce diamond, triangular, pentagonal, hexagonal, fan etc. special sizes, also could tailor-made according to customer drawing and dimension.

Our products of large-diameter, thick-walled square or rectangular tubes fill the part blank of domestic and abroad market. Our products are widely used in large scale steel structure engineering, machinery manufacturing, shipbuilding, bridges, construction industry, metallurgical industry, automotive industry, railways, highways, aviation, container, furniture, decoration and many industries. The company regards product quality as the lifeblood of the enterprise; use personality makes products, layers the guarantee the quality of products. Our company has passed ISO9001:2015 quality management system certification, products passed Europe Union 10210-1:2006, 10219-1:2006 CE certification and FPC issued by Lloyd. Company with more variety, large inventory, high quality, low price, short delivery time and good after-sales service, and many other competitive advantages, has become designated supplier of many large enterprises. Customers throughout our country in more than 20 provinces and cities and exported to the United States, Canada, Russia, India, Malaysia, Europe and other countries and regions.

This production line is the international leader and the first domestic gradual roll extrusion mill group, it abandoned the original workshop mode of cold drawn square steel tube, the small workshop mode have disadvantage of production slow, No quality assurance, twist, bend crack, uneven thickness, and the same time abandoned now widely used in cold unit lines, large quantity, low accuracy, single size, small caliber, thin (15.75mm) and other defects. The unit for forming, straightening one unit, the entire computer monitor, no need to manually pull hard. Fully automated units could ensure mechanical and physical properties of square tube and rectangular tubes. The hourly output of each production line more than 20 tons, all annual output up to 1.5 million tons.

Our chairman and general manager Changxing Hu, heartfelt thanks friends from all walks of life for many years trust and support, our all staff service to our clients as usual, and common development, win-win cooperation, good faith altogether casts and create brilliant.

Seamless square tube/rectangular tube

Seamless Square Tube,Seamless Rectangular Tube,Seamless Steel Square Tube,Seamless Steel Rectangular Tube

JINAN XIN JIYUAN SPECIAL SECTION TUBE CO., LTD. , http://www.squarepipes.com

Posted on